Pre-Drywall Phase Inspection

Documents framing, rough electrical, rough plumbing, HVAC rough-in, and hurricane-strap connections before they're sealed behind drywall.

What This Inspection Covers

A Pre-Drywall Phase Inspection documents framing, rough electrical, rough plumbing, HVAC rough-in, window/door flashing, and hurricane-strap connections before they're sealed behind drywall. It's the one phase where these details can still be seen and photographed.

What's Checked

  • •Structural framing and fastening
  • •Hurricane strap and clip connections at roof-to-wall and wall-to-foundation tie-downs
  • •Rough electrical wiring, box placement, and grounding
  • •Rough plumbing supply/DWV routing and any visible leaks or damage
  • •HVAC ductwork routing and unit placement
  • •Window and exterior door flashing before wrap
  • •Visible moisture intrusion
  • •Full photo documentation of all of the above

Who It's For

This inspection is for buyers of new-construction homes who want framing, rough-ins, and tie-down connections documented while they're still visible, before drywall permanently conceals them.

Important to Know

This is a visual inspection only, not a municipal or code inspection, engineering certification, or guarantee. It does not replace your local building department's own inspections.

Home inspector reviewing a tablet inside a newly framed house with exposed wood framing and rough plumbing before drywall installation.